• Home
  • About EPOJ
  • Current Issue
  • EPOC Conferences
    • About EPOC Conferences
    • 2024 EPOC Conference Info
    • 2024 Conference Papers
    • 2024 Awards
    • 2023 EPOC Conference Info
    • 2023 Conference Papers
    • 2023 Awards
    • 2025 EPOC Info
  • Journal Policies
  • Past Issues
    • Volume 10
    • Volume 9
    • Volume 8
    • Volume 7
    • Volume 6
    • Volume 5
    • Volume 4
    • Volume 3
    • Volume 2
    • Volume 1
  • Editorial Board
  • Author Information
  • More
    • Home
    • About EPOJ
    • Current Issue
    • EPOC Conferences
      • About EPOC Conferences
      • 2024 EPOC Conference Info
      • 2024 Conference Papers
      • 2024 Awards
      • 2023 EPOC Conference Info
      • 2023 Conference Papers
      • 2023 Awards
      • 2025 EPOC Info
    • Journal Policies
    • Past Issues
      • Volume 10
      • Volume 9
      • Volume 8
      • Volume 7
      • Volume 6
      • Volume 5
      • Volume 4
      • Volume 3
      • Volume 2
      • Volume 1
    • Editorial Board
    • Author Information
  • Home
  • About EPOJ
  • Current Issue
  • EPOC Conferences
    • About EPOC Conferences
    • 2024 EPOC Conference Info
    • 2024 Conference Papers
    • 2024 Awards
    • 2023 EPOC Conference Info
    • 2023 Conference Papers
    • 2023 Awards
    • 2025 EPOC Info
  • Journal Policies
  • Past Issues
    • Volume 10
    • Volume 9
    • Volume 8
    • Volume 7
    • Volume 6
    • Volume 5
    • Volume 4
    • Volume 3
    • Volume 2
    • Volume 1
  • Editorial Board
  • Author Information

Original Article

MajorProject Risk Management:Reconciling Complexity During Delivery with the Inside View in Planning

Paul Chapman and Cuong Quang

February 13, 2021


https://doi.org/10.25219/epoj.2021.00104

PDF Download

Abstract

Recent research on the origins of risk during the planning and delivery of major projects broadly addresses two root causes: (i) complexity at the planning phase and also during project delivery, and; (ii) ‘the inside view’ at the planning phase and the associated issues of strategic misrepresentation and cognitive biases such as optimism bias. This paper presents the results of a systematic review that finds a schism in the literature showing theoretical and empirical treatment of project delivery risk polarises into considering either the effect of complexity or the inside view; rarely are they considered jointly. This work discusses the implications for theory and practice and identifies Case Based Decision Theory and Bayesian modelling, both of which are outside view techniques, as having potential to reconcile complexity and the inside view and thus provide for their joint treatment. 


Keywords:   Risk management, major project, complexity, inside view 


Copyright © 2018 Engineering Project Organization Journal - All Rights Reserved.

Powered by

  • About EPOC Conferences
  • 2024 EPOC Conference Info
  • 2024 Conference Papers
  • 2024 Awards
  • Editorial Board